Aggregate production planning for shipbuilding with variation-inventory trade-offs

Journal

INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH
Volume 49, Issue 20, Pages 6249-6272

Publisher

TAYLOR & FRANCIS LTD
DOI: 10.1080/00207543.2010.527388

Keywords

aggregate production planning; genetic algorithm; multi-objective optimisation; shipbuilding

Ask authors/readers for more resources

Shipbuilding is a complex production system characterised by a complicated work and organisation structure, prolonged production lead time, and heterogeneous resource requirements. Thus, effectively planning all involved activities presents a challenging task and requires the timely coordination between the successive production stages at the plant level and effective resource allocation at the workshop level. With the work breakdown structure of all projects and their corresponding building strategies, the aggregate production planning (APP) is to address two important issues, namely, workforce level and inventory usage so that the fluctuating demands from downstream processes can be satisfied in a cost-effective manner. To achieve this, a novel APP model is proposed for ship production to minimise the variation of aggregate man-hour over the planning horizon and simultaneously minimise the logistic demands of the interim products. In view of the combinatorial nature and computational complexity, a directed genetic algorithm based solver has been developed to solve the two-conflicting-objective optimisation problem. The proposed approach has been applied to a case study and preliminary results have shown certain effectiveness in handling various situations with different planning strategies.

Authors

I am an author on this paper
Click your name to claim this paper and add it to your profile.

Reviews

Primary Rating

4.7
Not enough ratings

Secondary Ratings

Novelty
-
Significance
-
Scientific rigor
-
Rate this paper

Recommended

No Data Available
No Data Available