Journal
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH
Volume 48, Issue 5, Pages 1321-1338Publisher
TAYLOR & FRANCIS LTD
DOI: 10.1080/00207540802555736
Keywords
storage assignment; BOM structure; order picking; dedicated storage strategy
Categories
Funding
- National 863 plan of China [2008AAA04Z102]
Ask authors/readers for more resources
This paper deals with a correlated storage location assignment problem by considering the production bill of material (BOM) information. Due to the large number of parts in a BOM, the picking capacity constraint is considered. A mathematical model is formulated and a multi-stage heuristic is proposed. The heuristic relaxes the close interrelationships within the original problem through an improvement algorithm and an iterated approach to incorporate the effect of BOM splitting. In order to evaluate the performance of the heuristic, numerical experimentation is conducted in a single-block-multi-aisles warehouse, by using a randomly generated data set.
Authors
I am an author on this paper
Click your name to claim this paper and add it to your profile.
Reviews
Recommended
No Data Available