4.6 Article

Combination of TOPSIS and AHP in load shedding scheme for large pulp mill electrical system

Journal

Publisher

ELSEVIER SCI LTD
DOI: 10.1016/j.ijepes.2012.10.059

Keywords

Combination of TOPSIS and Analytical; Hierarchy Process (AHP); Load ranking; Pulp mill

Funding

  1. Ministry of Higher Education, Malaysia (MOHE)
  2. Research and Innovation Centre, UTHM under the Fundamental Research Grant Scheme (RGS) [0704]

Ask authors/readers for more resources

In the era of technology, a variety of powerful equipments are design to satisfy the demand of industry sector. However, these equipments need a stable and reliable electrical supply in order for the whole system to flow smoothly. The overview of this paper is mainly about the load shedding application toward a large pulp mill electrical system using the multi-decision making methods which are the Analytical Hierarchy Process (AHP) and the Technique for Order Preference by Similarity to Ideal Solution (TOPSIS) methods. Whenever there are shortages of electrical supply, the load shedding method shall be applied in order to recover and stabilize the system. Load shedding is a module that shed the higher possible load in the system to overcome the voltage shortage in the system. The objective of this paper is to extract the possible unnecessary load and determine the ranking of the load according to their importance level. The proposed methods are to test on the plant load shedding table from a paper pulp mill industry with 25 load points for practical applications. (c) 2012 Elsevier Ltd. All rights reserved.

Authors

I am an author on this paper
Click your name to claim this paper and add it to your profile.

Reviews

Primary Rating

4.6
Not enough ratings

Secondary Ratings

Novelty
-
Significance
-
Scientific rigor
-
Rate this paper

Recommended

No Data Available
No Data Available