Bottleneck-based scheduling method of multi-robot cells with residency constraints
Published 2014 View Full Article
- Home
- Publications
- Publication Search
- Publication Details
Title
Bottleneck-based scheduling method of multi-robot cells with residency constraints
Authors
Keywords
-
Journal
INTERNATIONAL JOURNAL OF COMPUTER INTEGRATED MANUFACTURING
Volume 28, Issue 12, Pages 1237-1251
Publisher
Informa UK Limited
Online
2014-10-14
DOI
10.1080/0951192x.2014.964322
References
Ask authors/readers for more resources
Related references
Note: Only part of the references are listed.- Scheduling rotationally arranged robotic cells served by a multi-function robot
- (2014) Mehdi Foumani et al. INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH
- Analysis of flexible robotic cells with improved pure cycle
- (2012) Mehdi Foumani et al. INTERNATIONAL JOURNAL OF COMPUTER INTEGRATED MANUFACTURING
- A tabu search algorithm with solution space partition and repairing procedure for cyclic robotic cell scheduling problem
- (2012) Pengyu Yan et al. INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH
- Cycle time analysis in reentrant robotic cells with swap ability
- (2012) Mehdi Foumani et al. INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH
- Try and error-based scheduling algorithm for cluster tools of wafer fabrications with residency time constraints
- (2012) Bing-hai Zhou et al. Journal of Central South University
- Industrial applications with cooperating robots for the flexible assembly
- (2011) Nikolaos Papakostas et al. INTERNATIONAL JOURNAL OF COMPUTER INTEGRATED MANUFACTURING
- An intelligent search algorithm-based method to derive assembly line design alternatives
- (2011) George Michalos et al. INTERNATIONAL JOURNAL OF COMPUTER INTEGRATED MANUFACTURING
- Multiple part-type scheduling in flexible robotic cells
- (2011) G. Didem Batur et al. INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS
- A polynomial algorithm for multi-robot 2-cyclic scheduling in a no-wait robotic cell
- (2010) Ada Che et al. COMPUTERS & OPERATIONS RESEARCH
- Robot workspace estimation and base placement optimisation techniques for the conversion of conventional work cells into autonomous flexible manufacturing systems
- (2010) M. F. Aly et al. INTERNATIONAL JOURNAL OF COMPUTER INTEGRATED MANUFACTURING
- Bicriteria robotic cell scheduling with controllable processing times
- (2010) Serdar Yildiz et al. INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH
- Throughput optimization in dual-gripper interval robotic cells
- (2009) Milind Dawande et al. IIE TRANSACTIONS
- A branch and bound algorithm for optimal cyclic scheduling in a robotic cell with processing time windows
- (2009) Pengyu Yan et al. INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH
- Multi-degree cyclic scheduling of a no-wait robotic cell with multiple robots
- (2008) Ada Che et al. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH
- Robotic cells with parallel machines and multiple dual gripper robots: a comparative overview
- (2008) H. Neil Geismar et al. IIE TRANSACTIONS
- Gene expression programming based meta-modelling approach to production line design
- (2008) A. Baykasoğlu INTERNATIONAL JOURNAL OF COMPUTER INTEGRATED MANUFACTURING
- Scheduling in robotic cells: process flexibility and cell layout
- (2008) Hakan Gultekin et al. INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH
Discover Peeref hubs
Discuss science. Find collaborators. Network.
Join a conversationPublish scientific posters with Peeref
Peeref publishes scientific posters from all research disciplines. Our Diamond Open Access policy means free access to content and no publication fees for authors.
Learn More