Probabilistic dynamic multi-objective model for renewable and non-renewable distributed generation planning

Journal

IET GENERATION TRANSMISSION & DISTRIBUTION
Volume 5, Issue 11, Pages 1173-1182

Publisher

INST ENGINEERING TECHNOLOGY-IET
DOI: 10.1049/iet-gtd.2011.0173

Keywords

-

Funding

  1. SYREL group of the Grenoble-INP University
  2. GIE-IDEA group of the Grenoble-INP University

Ask authors/readers for more resources

This study proposes a probabilistic dynamic model for multi-objective distributed generation (DG) planning, which also considers network reinforcement at presence of uncertainties associated with the load values, generated power of wind turbines and electricity market price. Monte Carlo simulation is used to deal with the mentioned uncertainties. The planning process is considered as a two-objective problem. The first objective is the minimisation of total cost including investment and operating cost of DG units, the cost paid to purchase energy from main grid and the network reinforcement costs. The second objective is defined as the minimisation of technical risk, including the probability of violating the safe operating technical limits. The Pareto optimal set is found using non-dominated sorting genetic algorithm method and the final solution is selected using a max-min method. The model is applied on two distribution networks and compared with other models to demonstrate its effectiveness.

Authors

I am an author on this paper
Click your name to claim this paper and add it to your profile.

Reviews

Primary Rating

4.4
Not enough ratings

Secondary Ratings

Novelty
-
Significance
-
Scientific rigor
-
Rate this paper

Recommended

No Data Available
No Data Available