Evolution of the crane selection and on-site utilization process for modular construction multilifts

期刊

AUTOMATION IN CONSTRUCTION
卷 43, 期 -, 页码 59-72

出版社

ELSEVIER
DOI: 10.1016/j.autcon.2014.03.015

关键词

Mobile crane lift; Lift logistics; Site layout; Mathematical algorithm; Modular construction

向作者/读者索取更多资源

Modular construction technology has been used in building construction for decades, having been widely utilized on sites with high traffic volume, restricted accessibility/storage, or business operations which cannot be interrupted by long construction time. A key challenge in this method of construction lies in planning and executing lifts within a short timeframe. In this regard, proper crane selection and site layout optimization can significantly increase productivity and shorten the lifting schedule. This paper thus proposes a methodology for the crane selection process and introduces mathematical algorithms to assess the construction of multi-lift operations. The modular lift process is divided into three stages: crane load and capacity check, crane location, and boom and superlift clearance. Each stage's parameters are introduced, analyzed, and graphically explained. The methodology logic is supported by a generalized mathematical algorithm and is applied and tested on a case study involving the construction of five three-storey dormitories in 10 working days for Muhlenberg College in Allentown, Pennsylvania. (C) 2012 Elsevier B.V. All rights reserved.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

4.7
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据