AUTOMATION IN CONSTRUCTION

期刊名
AUTOMATION IN CONSTRUCTION

AUTOMAT CONSTR

ISSN / eISSN
0926-5805
目标和范围
Automation in Construction is an international journal for the publication of original research papers. The journal publishes refereed material on all aspects pertaining to the use of Information Technologies in Design, Engineering, Construction Technologies, and Maintenance and Management of Constructed Facilities. The scope of Automation in Construction is broad, encompassing all stages of the construction life cycle from initial planning and design, through construction of the facility, its operation and maintenance, to the eventual dismantling and recycling of buildings and engineering structures. The following list of topics is not intended to be exhaustive, but rather to indicate topics that fall within the journal's purview:

• Computer-aided design, product modeling, decision support systems, classification and standardization, product data interchange
• Computer-aided engineering, process simulation models, graphics
• Robotics, metrology, logistics, automated inspection, demolition/remediation
• Facilities management, management information systems, intelligent control systems.
研究方向

结构与建筑技术

工程:土木

CiteScore
16.70 查看趋势图
CiteScore 学科排名
类别 分区 排名
Engineering - Civil and Structural Engineering Q1 #4/350
Engineering - Building and Construction Q1 #3/200
Engineering - Control and Systems Engineering Q1 #10/286
Web of Science 核心合集
Science Citation Index Expanded (SCIE) Social Sciences Citation Index (SSCI)
Indexed -
类别 (Journal Citation Reports 2023) 分区
CONSTRUCTION & BUILDING TECHNOLOGY - SCIE Q1
ENGINEERING, CIVIL - SCIE Q1
H-index
95
出版国家或地区
NETHERLANDS
出版商
Elsevier
出版周期
Bimonthly
出版年份
1992
年文章数
532
Open Access
NO
通讯方式
ELSEVIER SCIENCE BV, PO BOX 211, AMSTERDAM, NETHERLANDS, 1000 AE
认证评论
注: 认证评论选取于全球各个学术评论平台和社交媒体。
Engineering Automation, especially BIM-related, is an authoritative journal in the field of intelligent manufacturing. The submission process was not very smooth, with the first round of review taking over three months, mostly requiring major revisions. After making revisions for over a month, the second round of review was conducted quickly, and the reviewers were generally satisfied. Then, minor revisions were requested, and I thought there would be no issues. However, after submitting the minor revisions, the associate editor provided suggestions for major revisions again. After making targeted modifications once more, the final version was accepted by the editor. The reviewers and editors pay great attention to details.
2022-01-21
A mathematical algorithm was designed for a specific type of problem in architecture, and it took a little over a month to produce results, which was faster than I expected.
There were two reviewers.
Reviewer 1 provided detailed responses to the nine questions posed by the journal in the format requested by the AIC. Although their focus was slightly different from my paper, they provided meaningful suggestions.
Reviewer 2's comments seemed more inclined towards rejecting the paper rather than completing the review task.
Timeline:
* Jul 25, 2022: Submitted
* Jul 26, 2022: With Editor
* Jul 29, 2022: Under Review
* Aug 11, 2022: Under Review
* Sept 3, 2022: Decision in Process
* Sept 5, 2022: Reject
2022-09-06

Add your recorded webinar

Do you already have a recorded webinar? Grow your audience and get more views by easily listing your recording on Peeref.

Upload Now

Create your own webinar

Interested in hosting your own webinar? Check the schedule and propose your idea to the Peeref Content Team.

Create Now