期刊
AUTOMATION IN CONSTRUCTION
卷 19, 期 8, 页码 1016-1026出版社
ELSEVIER
DOI: 10.1016/j.autcon.2010.08.002
关键词
Hybrid system; Excavator; Energy regeneration system; Energy saving
资金
- National Natural Science Foundation of China [50875233]
- State 863 project [2009AA044402]
- 985 Project of China
- Hitachi Construct Machine Co. Ltd.
This paper deals with the method of how to regenerate the potential energy for a hybrid hydraulic excavator (HHE). After studying the structure and working cycle of the HHE. two energy regeneration systems are considered. Then, the control strategy and parameter matching for the proposed energy regeneration system (ERS) are discussed. United simulations with AMEsim and MATLAB/simulink for the conventional control system and two ERSs are carried out in this paper. An estimated 41% of the total potential energy could be regenerated at the lowering of the boom in accumulator-motor-generator system while the recovery efficiency in the motor-generator system is only about 17%, and it is also shown that the accumulator-motor-generator energy regeneration system (AMGERS) features better speed control of the boom and response characteristics than the motor-generator energy regeneration system (MGERS). hence, the AMGERS is a good configuration for the HHE at present. (C) 2010 Elsevier B.V. All rights reserved.
作者
我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。
推荐
暂无数据