标题
A Hybrid MCDM Technique for Risk Management in Construction Projects
作者
关键词
-
出版物
Symmetry-Basel
Volume 10, Issue 2, Pages 46
出版商
MDPI AG
发表日期
2018-02-14
DOI
10.3390/sym10020046
参考文献
相关参考文献
注意:仅列出部分参考文献,下载原文获取全部文献信息。- Hybrid SWARA-COPRAS method for risk assessment in deep foundation excavation project: an iranian case study
- (2017) Alireza VALIPOUR et al. Journal of Civil Engineering and Management
- A model of discrete zero-sum two-person matrix games with grey numbers to solve dispute resolution problems in construction
- (2017) Mostafa KHANZADI et al. Journal of Civil Engineering and Management
- D-DEMATEL: A new method to identify critical success factors in emergency management
- (2017) Xinyi Zhou et al. SAFETY SCIENCE
- DEMATEL-ANP Risk Assessment in Oil and Gas Construction Projects
- (2017) Gholamreza Dehdasht et al. Sustainability
- Iterative Speedup by Utilizing Symmetric Data in Pricing Options with Two Risky Assets
- (2017) Dohyun Pak et al. Symmetry-Basel
- Occurrence of Chiral Bioactive Compounds in the Aquatic Environment: A Review
- (2017) Cláudia Ribeiro et al. Symmetry-Basel
- Novel Integrated Multi-Criteria Model for Supplier Selection: Case Study Construction Company
- (2017) Željko Stević et al. Symmetry-Basel
- An interval-valued intuitionistic fuzzy MABAC approach for material selection with incomplete weight information
- (2016) Yi-Xi Xue et al. APPLIED SOFT COMPUTING
- Risk identification and assessment for engineering procurement construction management projects using fuzzy set theory
- (2016) Ahmad Salah et al. CANADIAN JOURNAL OF CIVIL ENGINEERING
- A novel distance function of D numbers and its application in product engineering
- (2016) Meizhu Li et al. ENGINEERING APPLICATIONS OF ARTIFICIAL INTELLIGENCE
- A hybrid fuzzy evaluation method for curtain grouting efficiency assessment based on an AHP method extended by D numbers
- (2016) Guichao Fan et al. EXPERT SYSTEMS WITH APPLICATIONS
- An Interval Type-2 Fuzzy Likelihood-Based MABAC Approach and Its Application in Selecting Hotels on a Tourism Website
- (2016) Su-min Yu et al. International Journal of Fuzzy Systems
- Pythagorean Fuzzy Choquet Integral Based MABAC Method for Multiple Attribute Group Decision Making
- (2016) Xindong Peng et al. INTERNATIONAL JOURNAL OF INTELLIGENT SYSTEMS
- PROPOSING A NEURAL NETWORK MODEL TO PREDICT TIME AND COST CLAIMS IN CONSTRUCTION PROJECTS
- (2016) Vahidreza YOUSEFI et al. Journal of Civil Engineering and Management
- INTERNAL AND EXTERNAL RISK BASED ASSESMENT AND EVALUATION FOR THE LARGE INFRASTRUCTURE PROJECTS
- (2016) Ivana BURCAR DUNOVIC et al. Journal of Civil Engineering and Management
- COMPREHENSIVE RISK MANAGEMENT USING FUZZY FMEA AND MCDA TECHNIQUES IN HIGHWAY CONSTRUCTION PROJECTS
- (2016) Mohsen AHMADI et al. Journal of Civil Engineering and Management
- A Modified TOPSIS Method Based onDNumbers and Its Applications in Human Resources Selection
- (2016) Liguo Fei et al. MATHEMATICAL PROBLEMS IN ENGINEERING
- A Method to Determine Generalized Basic Probability Assignment in the Open World
- (2016) Wen Jiang et al. MATHEMATICAL PROBLEMS IN ENGINEERING
- Conflicting evidence combination based on uncertainty measure and distance of evidence
- (2016) Wen Jiang et al. SpringerPlus
- The selection of transport and handling resources in logistics centers using Multi-Attributive Border Approximation area Comparison (MABAC)
- (2015) Dragan Pamučar et al. EXPERT SYSTEMS WITH APPLICATIONS
- An integrated green supplier selection approach with analytic network process and improved Grey relational analysis
- (2015) Seyed Hamid Hashemi et al. INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS
- RISK IDENTIFICATION AND ALLOCATION IN UNDERGROUND RAIL CONSTRUCTION JOINT VENTURES: CONTRACTORS’ PERSPECTIVE
- (2015) Bon-Gang HWANG et al. Journal of Civil Engineering and Management
- D-CFPR: D numbers extended consistent fuzzy preference relations
- (2015) Xinyang Deng et al. KNOWLEDGE-BASED SYSTEMS
- Construction projects selection and risk assessment by fuzzy AHP and fuzzy TOPSIS methodologies
- (2014) Osman Taylan et al. APPLIED SOFT COMPUTING
- Failure mode and effects analysis using D numbers and grey relational projection method
- (2014) Hu-Chen Liu et al. EXPERT SYSTEMS WITH APPLICATIONS
- SEMI-IDEAL BIDDING VIA A FUZZY TOPSIS PROJECT EVALUATION FRAMEWORK IN RISKY ENVIRONMENTS
- (2014) Mehdi Ravanshadnia et al. Journal of Civil Engineering and Management
- Construction project risk assessment by using adaptive-network-based fuzzy inference system: An empirical study
- (2014) Mehdi Ebrat et al. KSCE Journal of Civil Engineering
- Supplier selection based on evidence theory and analytic network process
- (2014) Xiaoge Zhang et al. PROCEEDINGS OF THE INSTITUTION OF MECHANICAL ENGINEERS PART B-JOURNAL OF ENGINEERING MANUFACTURE
- Bridge Condition Assessment UsingDNumbers
- (2014) Xinyang Deng et al. TheScientificWorldJOURNAL
- Environmental impact assessment based on D numbers
- (2013) Xinyang Deng et al. EXPERT SYSTEMS WITH APPLICATIONS
- Supplier selection using AHP methodology extended by D numbers
- (2013) Xinyang Deng et al. EXPERT SYSTEMS WITH APPLICATIONS
- A DST-based approach for construction project risk analysis
- (2013) A Taroun et al. JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY
- Risk evaluation of tunneling projects
- (2012) M.M. Fouladgar et al. Archives of Civil and Mechanical Engineering
- Supplier selection using consistent fuzzy preference relations
- (2011) Yueh-Hsiang Chen et al. EXPERT SYSTEMS WITH APPLICATIONS
- https://journals.vgtu.lt/index.php/JCEM/article/view/5898
- (2010) Edmundas Kazimieras Zavadskas et al. Journal of Civil Engineering and Management
- Risk Management in the Construction Industry Using Combined Fuzzy FMEA and Fuzzy AHP
- (2010) Mohamed Abdelgawad et al. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT
- Fuzzy Monte Carlo Simulation and Risk Assessment in Construction
- (2009) N. Sadeghi et al. COMPUTER-AIDED CIVIL AND INFRASTRUCTURE ENGINEERING
- Methodology for Integrated Risk Management and Proactive Scheduling of Construction Projects
- (2008) Damien Schatteman et al. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT
- Identification and Initial Risk Assessment of Construction Projects in Poland
- (2008) Dariusz Skorupka JOURNAL OF MANAGEMENT IN ENGINEERING
Find Funding. Review Successful Grants.
Explore over 25,000 new funding opportunities and over 6,000,000 successful grants.
ExploreAdd your recorded webinar
Do you already have a recorded webinar? Grow your audience and get more views by easily listing your recording on Peeref.
Upload Now