4.7 Article

Automated hazardous area identification using laborers' actual and optimal routes

期刊

AUTOMATION IN CONSTRUCTION
卷 65, 期 -, 页码 21-32

出版社

ELSEVIER
DOI: 10.1016/j.autcon.2016.01.006

关键词

Safety management; Hazard area identification; Automated data collection (ADC); Real-time locating system (RTLS); Building information modeling (BIM)

资金

  1. Ministry of Land, Infrastructure, and Transport of the Korean government [14AUDP-C067809-2]

向作者/读者索取更多资源

Approximately 20% of accidents in construction industry occur while workers are moving through a construction site. Current construction hazard identification mostly relies on safety managers' capabilities to detect hazards. Consequently, numerous hazards remain unidentified, and unidentified hazards mean that hazards are not included in the safety management process. To enhance the capability of hazard identification, this paper proposes an automated hazardous area identification model based on the deviation between the optimal route (shortest path) which is determined by extracting nodes from objects in a building information model (BIM) and the actual route of a laborer collected from the real-time location system (RTLS). The hazardous area identification framework consists of six DBs and three modules. The unidentified hazardous area identification module identifies potentially hazardous areas (PHAs) in laborers' paths. The filtering hazardous area module reduces the range of possible hazardous areas to improve the efficiency of safety management The monitoring and output, generation module provides reports including hazardous area information. The suggested model can identify a hazard automatically and decrease the time laborers are exposed to a hazard. This can help improve both the effectiveness of the hazard identification process and enhance the safety for laborers. (C) 2016 Elsevier B.V. All rights reserved.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

4.7
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据