4.6 Article

Changes in a large regulated tropical river: The Parana River downstream from the Porto Primavera Dam, Brazil

期刊

GEOMORPHOLOGY
卷 113, 期 3-4, 页码 230-238

出版社

ELSEVIER SCIENCE BV
DOI: 10.1016/j.geomorph.2009.03.015

关键词

Dams; Channel changes; Regulated river; River ecology; Parana River

资金

  1. National Agency of Research CNPq/PELD
  2. CNPq/CT-HIDRC
  3. CNPq [47.0148/2004]
  4. Sao Paulo State Research Agency FAPESP [04/14057-5]

向作者/读者索取更多资源

Dams disturb in the fluvial dynamics by changing the natural cycle of the rivers, interfering with the transport-deposition processes and affecting river ecology. The Brazilian part of the Parana Basin has the largest hydrometrical power potential of the country with more than 150 hydroelectric power dams that transformed the Parana River and its tributaries in a succession of lakes. This research aims to analyze the changes in certain fluvial variables in the last natural downstream reach of the Upper Parana River after closure of the Porto Primavera Dam. Data acquired before and after dam construction showed changes in water discharge, bank erosion, flood pulse, bed load grain size discharge, concentration of suspended load and bedform morphology and size. Those alterations generated changes in river ecology especially on fish reproduction, benthic community, and rotifers; variety and density. A review of the obscure regional literature, generally in Portuguese, is also presented. (C) 2009 Elsevier B.V. All rights reserved.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

4.6
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据