4.5 Article

Position of Maximum Ceiling Temperature in a Tunnel Fire

期刊

FIRE TECHNOLOGY
卷 50, 期 4, 页码 889-905

出版社

SPRINGER
DOI: 10.1007/s10694-012-0309-2

关键词

Tunnel fire; Position; Flame angle; Maximum ceiling temperature; Heat release rate; Ventilation velocity

资金

  1. Swedish Road Administration (SRA)
  2. SP Tunnel and Underground Safety Centre

向作者/读者索取更多资源

The position of the maximum ceiling gas temperature indicates how far the fire plum could be blown away by a ventilation flow. It could be applied to estimate the activation of a detection system or a sprinkler system, or to estimate the range of damage to the tunnel structure. An equation for predicting the position of the maximum ceiling gas temperature in a tunnel fire is proposed based on a theoretical analysis and validated using both laboratory test data and full scale test data. A flame angle has been defined based on the position of the maximum ceiling temperature in a tunnel fire. The flame angle is directly related to the dimensionless ventilation velocity, and it becomes insensitive to the heat release rate for a large tunnel fire. Further, it is found that a constant critical flame angle exists, defined as the flame angle under the critical condition when the backlayering just disappears. For a given tunnel and fire source, the flame angle under critical conditions is the same value, independent of heat release rate, and the maximum ceiling temperature under critical conditions always corresponds to the same position. Generally the horizontal distance between the position of the maximum ceiling temperature and the fire source centre is around 1.5 times the effective tunnel height under the critical condition.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

4.5
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据