期刊
EUROPEAN JOURNAL OF INDUSTRIAL ENGINEERING
卷 5, 期 2, 页码 215-231出版社
INDERSCIENCE ENTERPRISES LTD
DOI: 10.1504/EJIE.2011.039873
关键词
simulation; quality; machine breakdown; production quantity; cycle time
1 to determine the optimum level of batch size in bottleneck facility 2 to analyse the effect of common processes on throughput and cycle time in a multistage production system under machine breakdown and quality uncertainty. In this research, the authors developed simulation models for multistage production system under common processes in an uncertain situation created by machine breakdown and quality variation. Few simulation models are developed based on a live case from a company. The models are verified and validated with the historical data from the company and by face validity. Taguchi approaches for orthogonal array are used in designing experiments. The experimental settings are executed in WITNESS, a simulation package. It is observed that the variation in level of common process in the system has significant impact on the production quantity and cycle time. There is strong interaction among the common process and the batch size in lancing stations. The production quantity is elevated and cycle time is least when the batch size in bottleneck facility is 12 and two common processes are used.
作者
我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。
推荐
暂无数据