期刊
ENVIRONMENTAL TECHNOLOGY
卷 35, 期 6, 页码 766-772出版社
TAYLOR & FRANCIS LTD
DOI: 10.1080/09593330.2013.850519
关键词
wastewater treatment; Unitank process; biological phosphorus removal; optimization; solid retention time
资金
- Chinese National 863 Program [2012AA063403]
- Shanghai Chenguang Program [2011CG60]
- Innovation Program of Shanghai Municipal Education Commission [12YZ137]
- 085 Project Program 'Energy Storage Technologies of Intelligence Network'
The Unitank process combines the advantages of traditional continuous-flow activated sludge processes and sequencing batch reactors, and has been extensively employed in many wastewater treatment plants (WWTPs) in China. Biological phosphorus removal (BPR) of a full-scale Unitank WWTP was optimized by increasing anaerobic time from 80 to 120 min in an operation cycle of 360 min and reducing solid retention time (SRT) from 21.3 to 13.1 d. The BPR efficiency of the full-scale Unitank system increased from 63.8% (SRT of 21.3 d) to 83.2% for a SRT of 13.1 d. When the anaerobic time increased from 80 to 120 min, the net anaerobic phosphorus release amount increased from 0.25 to 1.06 mg L-1, and sludge phosphorus content rose from 13.8 to 15.0 mgP center dot(gSS)(-1). During half an operation cycle, the average specific phosphorus release rate increased from 0.097 mgP center dot(gVSS center dot h)(-1) in 0-40 min to 0.825 mgP center dot(gVSS center dot h)(-1) in 40-60 min. Reducing SRT and increasing anaerobic time account for 84.6% and 15.4% in the total increment of phosphorus removal of 1.15 mg L-1.
作者
我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。
推荐
暂无数据