Landslides and rock avalanches triggered by the 2008 Wenchuan Earthquake produced 257 landslide dams, mainly situated along the eastern boundary of the Qinghai-Tibet Plateau where rivers descend approximately 3,000 m into the Sichuan Basin. The largest of these dams blocked the Tongkou River (a tributary of the Fujiang River) at Tangjiashan. The blockage, consisting of 2.04 x 10(7) m(3) of landslide debris, impounded a lake with a projected maximum volume of 3.15 x 10(8) m(3), potentially inundating 8.92 km(2) of terrain. Its creation during the rainy season and the possibility of an uncontrolled release posed a serious, impending threat to at least 1.3 million people downstream that could add substantially to the total of 69,200 individuals directly killed by the earthquake. Risk assessment of the blockage indicated that it was unlikely to collapse suddenly, and that eventual overtopping could be mitigated by notching the structure in order to create an engineered breach and achieve safe drainage of the lake. In addition to the installation of monitoring and warning instrumentation, for emergency planning we estimated several outburst scenarios equivalent to 20, 25, 33, and 50% of the dam failing suddenly, creating, respectively, 3.35, 3.84, 4.22, and 4.65 km(2) of flooded area, and overbank water depths of 4.6, 5.1, 5.7, and 6.2 m, respectively, in Mianyang, the second largest city in Sichuan Province, 48 km downstream from the blockage. Based on these scenarios, recommendations and plans for excavating a sluiceway, draining the lake, and downstream evacuation were proposed and later were implemented successfully, with the blockage breached by overtopping on June 10, less than a month after dam emplacement. The peak discharge of the release only slightly exceeded the flood of record at Mianyang City. No lives were lost, and significant property damage was avoided. Post-breaching evaluation reveals how future similar mitigation can be improved. Although initial breach erosion was slow, later erosion was judged uncontrollably rapid; increased slope of the engineered channel and adoption of a compound, trapezoid-triangular cross-section can be considered, as can other measures to control the rate of breach incision. Evacuees from Mianyang City spent an unnecessarily long time (12 days) in temporary settlements; more precise risk management planning can reduce this time in the future.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

4.6
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据