4.5 Article

Two-dimensional habitat modeling of Chinese sturgeon spawning sites

期刊

ECOLOGICAL MODELLING
卷 221, 期 5, 页码 864-875

出版社

ELSEVIER SCIENCE BV
DOI: 10.1016/j.ecolmodel.2009.11.018

关键词

Habitat suitability index model; Two-dimensional mathematic model; Chinese sturgeon; Three Gorges Project; Reservoir management; Yangtze River

类别

资金

  1. National Natural Science Foundation of China [50909006, 50939001]
  2. National Basic Research Program of China [2003CB415206]

向作者/读者索取更多资源

Since the construction of the Gezhouba Dam in the 1980s, the number of Chinese sturgeon in the Yangtze River has been rapidly declining. The Gezhouba Dam has cutoff the migration path of these sturgeon, resulting in an overall reduction of suitable sturgeon habitat. This paper describes a habitat suitability index model that is used to evaluate the impacts of the Gezhouba Dam and Three Gorges Project on Chinese sturgeon spawning sites. Based on research concerning the reproduction characteristics of Chinese sturgeon, ten major ecological factors that influence reproduction were analyzed, including: water temperature, velocity, water depth, substrate, suspended sediment concentration, and the amount of egg predatory fish. The suitability index (SI) curves based on these ten ecological factors were obtained, and a habitat suitability function was developed. A two-dimensional mathematical model was also created to simulate and predict physical habitat situation (such as hydraulic, sediment, and substrate) of the Chinese sturgeon. By coupling the habitat suitability function and a two-dimensional mathematical model, a habitat suitability index model for Chinese sturgeon was established. The habitat suitability index model was validated by comparing measured data with predictions from the model. These comparisons showed that the computed results agreed well with the measured results, and the high calculated habitat suitability index (HSI) corresponded to high measured quantity of eggs per unit (1000 m(3)) discharge (CPUE(d)). The calculated habitat suitability index for Chinese sturgeon also showed that the habitat suitability index was better in 1999, before the impoundment of the Three Gorges Project, compared with the habitat suitability in 2003. Simulation results of different discharges from Gezhouba Dam predicted that flow discharges between 10,000 and 30,000 m(3)/s were most suitable for sturgeon spawning. (C) 2009 Elsevier B.V. All rights reserved.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

4.5
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据