4.4 Article Proceedings Paper

Effects of flow alteration on Apple-ring Acacia (Faidherbia albida) stands, Middle Zambezi floodplains, Zimbabwe

期刊

ECOHYDROLOGY
卷 8, 期 5, 页码 922-934

出版社

WILEY
DOI: 10.1002/eco.1541

关键词

dam-impact; dendrochronology; F; albida; floodplain ecosystem; flow regime; Middle Zambezi; regeneration; stand structure

资金

  1. Dutch Ministry of Foreign Affairs

向作者/读者索取更多资源

The impounding of the Zambezi River by Kariba dam has regulated the river discharge of the Middle Zambezi river. This has been implicated in the failure of regeneration of Faidherbia albida in the downstream flood plain. This study aimed (1) to assess the effect of the altered flow regime of the river on the establishment and growth of F. albida on the Middle Zambezi floodplain and islands and (2) to test the potential of dendrochronology in detecting the age and long-term growth rates of F. albida in response to flow regime. Results indicated an uneven age distribution of F. albida stands on relatively new islands', dominated by young trees, while the floodplain and the old island' exhibited an even-aged stand but with a lack of regeneration, and a dying-off of older trees. The lack of F. albida establishment on the floodplain was linked to the decreased occurrence of flooding events, associated with a decrease in alluvial deposits, soil moisture and groundwater recharge. These effects may be enhanced by impact from browsers on regeneration of trees. Tree-ring analyses revealed the presence of distinct annual growth rings in F. albida and the applicability of dendrochronology for estimating F. albida population dynamics. The trees on the new islands' are younger and grow faster than those on the floodplain. Lack of competition and possible favourable moisture conditions suggest beneficial conditions for establishment and growth of the trees on the islands. Copyright (c) 2014 John Wiley & Sons, Ltd.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

4.4
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据