4.7 Article

Time focused measurements of roof runoff quality

期刊

CORROSION SCIENCE
卷 50, 期 2, 页码 384-391

出版社

PERGAMON-ELSEVIER SCIENCE LTD
DOI: 10.1016/j.corsci.2007.08.011

关键词

metal roof; zinc; first flush; roof runoff; runoff rate

向作者/读者索取更多资源

Runoff properties and their changes during runoff of a 14 year old zinc roof were investigated. Zinc, lead, cadmium, pH value, rain intensity and electric conductivity have been measured for a period of one year. A runoff rate of 3.73 g/m(2) a and a volume weighted mean zinc concentration of 4.9 mg/L were determined. First flush behaviour was observed in 93% of runoff events. Low rain intensities are correlating with higher zinc concentrations in runoff, whereas the duration of antecedent dry periods could not directly be linked with initial zinc concentrations. (C) 2007 Elsevier Ltd. All rights reserved.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

4.7
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据