期刊
BULLETIN OF ENGINEERING GEOLOGY AND THE ENVIRONMENT
卷 69, 期 3, 页码 373-380出版社
SPRINGER HEIDELBERG
DOI: 10.1007/s10064-010-0267-1
关键词
High geo-stress; Slope; Foundation; Excavation
The Jinping I Hydropower Station will generate some 3,600 MW. The site of the 305 m high arch dam is in a steep, 1,500-2,500 m deep valley on the Yalong River in Sichuan Province, South West China. The present geo-stresses in the marble bedrock are up to 40 MPa. Relaxation due to river incision has resulted in fractures opening up to 350 m from the rock face. The geo-stresses in the rock mass are significantly affected by the topography. A concentration of stress has developed at the foot of the slope and in the valley floor; it was estimated there would be 132 mm of relaxation/heave of the formation level. The paper discusses some of the engineering geological problems encountered as a result of the high geo-stresses and the mitigation measures undertaken.