4.6 Article

Engineering geological problems related to high geo-stresses at the Jinping I Hydropower Station, Southwest China

期刊

出版社

SPRINGER HEIDELBERG
DOI: 10.1007/s10064-010-0267-1

关键词

High geo-stress; Slope; Foundation; Excavation

向作者/读者索取更多资源

The Jinping I Hydropower Station will generate some 3,600 MW. The site of the 305 m high arch dam is in a steep, 1,500-2,500 m deep valley on the Yalong River in Sichuan Province, South West China. The present geo-stresses in the marble bedrock are up to 40 MPa. Relaxation due to river incision has resulted in fractures opening up to 350 m from the rock face. The geo-stresses in the rock mass are significantly affected by the topography. A concentration of stress has developed at the foot of the slope and in the valley floor; it was estimated there would be 132 mm of relaxation/heave of the formation level. The paper discusses some of the engineering geological problems encountered as a result of the high geo-stresses and the mitigation measures undertaken.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

4.6
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据