4.8 Article Proceedings Paper

How to achieve a 100% RES electricity supply for Portugal?

期刊

APPLIED ENERGY
卷 88, 期 2, 页码 508-517

出版社

ELSEVIER SCI LTD
DOI: 10.1016/j.apenergy.2010.09.006

关键词

Renewable energy; H2RES; Sustainable energy planning; Energy storage; 100% Renewable systems; Portugal

向作者/读者索取更多资源

Portugal is a country with an energy system highly dependent on oil and gas imports Imports of oil and gas accounted for 85% of the country s requirements in 2005 and 86% in 2006 Meanwhile the share of renewable energy sources (RES) in the total primary energy consumption was only 14% in 2006 When focusing only on electricity production the situation is somewhat better The share of RES in gross electricity production varies between 20% and 35% and is dependent on the hydropower production in wet and dry years This paper presents on a national scale Portugal s energy system planning and technical solutions for achieving 100% RES electricity production Planning was based on hourly energy balance and use of H2RES software The H2RES model provides the ability to integrate various types of storages Into energy systems in order to increase penetration of the intermittent renewable energy sources or to achieve a 100% renewable Island region or country The paper also represents a stepping-stone for studies offering wider possibilities in matching and satisfying electricity supply in Portugal with potential renewable energy sources Special attention has been given to intermittent sources such as wind solar and ocean waves that can be coupled to appropriate energy storage systems charged with surplus amounts of produced electricity The storage systems also decrease Installed power requirements for generating units Consequently these storages will assist in avoiding unnecessary rejection of renewable potential and reaching a sufficient security of energy supply (C) 2010 Elsevier Ltd All rights reserved

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

4.8
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据