4.3 Article

Risk analysis in the spillway of dam Oros by excess of influent flow

期刊

ANAIS DA ACADEMIA BRASILEIRA DE CIENCIAS
卷 85, 期 1, 页码 405-414

出版社

ACAD BRASILEIRA DE CIENCIAS
DOI: 10.1590/S0001-37652013005000016

关键词

risk analysis; public dams; reservoirs; water resources management

向作者/读者索取更多资源

This paper presents the practical application of concepts, and some methods of risk analysis, to check the possibility of overcoming a water level of project in the spillway of dam Oros, by excess of influent flow. Also evaluated the empirical formulas contained in the original design. Due to the difficulty of obtaining design data from the dam, since the end of construction date of January, 11, 1961, we minimize the effects of some variables in the calculations, leading us to the consequent simplification of the scenario under study. For a better evaluation and characterization of the setting, some variables in the model such as water level, accumulation and flow of the spillway, had updated their data to June 28, 2011. We have demonstrated the importance of risk analysis for project design, construction and operation of large reservoirs, and the need for ongoing assessments of works of this nature.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

4.3
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据