4.7 Article

Joint maintenance-inventory optimisation of parallel production systems

期刊

JOURNAL OF MANUFACTURING SYSTEMS
卷 48, 期 -, 页码 73-86

出版社

ELSEVIER SCI LTD
DOI: 10.1016/j.jmsy.2018.06.002

关键词

Maintenance; Inventory; Parallel production; Delay-Time; Spare parts; Simulation

向作者/读者索取更多资源

We model a joint inspection and spare parts inventory policy for maintaining machines in a parallel system, where simultaneous downtime seriously impacts upon production performance and has a significant financial consequence. This dependency between system components means that analysis of realistic maintenance models is intractable. Therefore we use simulation and a numerical optimisation tool to study the cost-optimality of several policies. Inspection maintenance is modelled using the delay-time concept. Critical spare parts replenishment is considered using several variants of a periodic review policy. In particular, our results indicate that the cost-optimal policy is characterised by equal frequencies of inspection and replenishment, and delivery of spare parts that coincides with maintenance intervention. In general, our model provides a framework for studying the interaction of spare parts ordering with maintenance scheduling. The sensitivity analysis that we present offers insights for the effective management of such parallel systems, not only in a paper-making plant, which motivates our modelling development, but also in other manufacturing contexts.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

4.7
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据