4.6 Article

Selecting Project Risk Preventive and Protective Strategies Based on Bow-Tie Analysis

期刊

出版社

ASCE-AMER SOC CIVIL ENGINEERS
DOI: 10.1061/(ASCE)ME.1943-5479.0000603

关键词

Project risk response; Risk preventive strategy; Risk protective strategy; Fuzzy optimization model; Bow-tie analysis

资金

  1. National Science Foundation of China [71471032]
  2. Liaoning BaiQianWan Talents Program [[2015] 18]
  3. Research Fund for the Doctoral Program of Higher Education of China [20130042110030]

向作者/读者索取更多资源

In the practice of project risk management, project managers need to determine preventive actions to reduce risk probability before the risk occurs and/or protective actions to lower the risk impact after the risk occurrence. This paper proposes a method that integrates the bow-tie analysis and optimization model to determine risk response strategies from the preventive and protective perspectives. In the proposed method, bow-tie analysis is used to identify and analyze the causes and consequences of the risk event, the risk preventive strategies with respect to the causes, and the protective strategies with respect to the consequences. Then, the likelihood of the occurrence and the total loss of the risk event are calculated. The fuzzy optimization model is built to select proper risk preventive and protective strategies under the constraints of the risk likelihood, risk loss, and the expected loss. Finally, to demonstrate the proposed method, a case study is provided and some insights for managerial practice are drawn.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

4.6
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据