期刊
RELIABILITY ENGINEERING & SYSTEM SAFETY
卷 168, 期 -, 页码 306-316出版社
ELSEVIER SCI LTD
DOI: 10.1016/j.ress.2017.03.007
关键词
Maintenance; Spare parts; Delay-time; Simulation; Joint optimisation
The demand for industrial plant spare parts is driven, at least in part, by maintenance requirements. It is therefore important to jointly optimise planned maintenance and the associated spare parts inventory using the most appropriate maintenance and replenishment policies. In this simulation-based study, we address this challenge in the context of the random failure of parts in service and the replacement of defective parts at inspections of period T. Inspections are modelled using the delay-time concept. A number of simultaneous periodic review and continuous review replenishment policies are compared. A paper making plant provides a real context for the presentation of our ideas. We survey practitioners working with such plant to collect real data that inform the values of parameters in the models. Our simulation results indicate that a periodic review policy with ordering that is twice as frequent as inspection is cost optimal in the context of the plant that we study. For the purpose of comparison, we also present and discuss the characteristics of the various policies considered. (C) 2017 Elsevier Ltd. All rights reserved.
作者
我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。
推荐
暂无数据