4.7 Article

Life cycle environmental and economic assessment of a LID-BMP treatment train system: A case study in China

期刊

JOURNAL OF CLEANER PRODUCTION
卷 149, 期 -, 页码 227-237

出版社

ELSEVIER SCI LTD
DOI: 10.1016/j.jclepro.2017.02.086

关键词

Stormwater; LID-BMP; Life-cycle assessment; Life-cycle costing; Environmental impact

资金

  1. Programme of Introducing Talents of Discipline to Universities [B07002]
  2. Natural Science Foundation Project [51278267]
  3. National Water Pollution Control Special Project [2011ZX07301003]

向作者/读者索取更多资源

A cost-combined life-cycle assessment was conducted to estimate the environmental and economic burdens of a low impact development best management practice (LID-BMP) treatment train system in China. Results showed that climate change, human toxicity, terrestrial ecotoxicity, freshwater ecotoxicity, marine ecotoxicity and fossil depletion dominantly contributed to the overall environmental effect. Infiltration pit exhibited the highest environmental effects because of high consumption of PVC and nonwoven fabrics, whereas grassed swale and buffer strip had the lowest environmental impacts. The operation phase showed great environmental benefits because a LID-BMP treatment train system can significantly reduce the emissions of heavy metals, suspended solids, total nitrogen, and total phosphorus to water. From an economic perspective, constructed wetland exhibited the highest economic burdens where the costs of graded gravel and bedding plants had a significant function, whereas grassed swale had the lowest economic burdens because of low consumption of raw materials. Optimizing the efficiency of PVC, non-woven fabric consumption, and road transport is an effective way to improve the potential environmental performance of LID-BMP construction phase. (C) 2017 Elsevier Ltd. All rights reserved.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

4.7
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据