4.7 Article

The Repair Kit Problem with positive replenishment lead times and fixed ordering costs

期刊

EUROPEAN JOURNAL OF OPERATIONAL RESEARCH
卷 261, 期 3, 页码 893-902

出版社

ELSEVIER SCIENCE BV
DOI: 10.1016/j.ejor.2017.02.019

关键词

OR in service industries; Inventory; Repair kit problem; Lead times; Service parts

资金

  1. Universita degli Studi di Brescia
  2. The Netherlands Organisation for Scientific Research (NWO) [406-15-014]

向作者/读者索取更多资源

The Repair Kit Problem (RKP) concerns the determination of a set of items taken by a service engineer to perform on-site product support. Such a set is called a kit. Models developed in the literature have always ignored the lead times associated with delivering items to replenish the kit, thereby limiting the practical relevance of the proposed solutions. Motivated by a real life case, we develop a model with positive lead times to control the replenishment quantities of the items in the kit, and study the performance of (s, S) policies under a service objective. The choice for (s, S) policies is made in order to accommodate fixed ordering costs. We present a method to calculate job fill rates with exact expressions, and discuss a heuristic approach to optimize the reorder level and order-up-to level for each item in the kit. The empirical utility of the model is assessed on real world data from an equipment manufacturer and useful insights are offered to after-sales managers. (C) 2017 Elsevier B.V. All rights reserved.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

4.7
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据