4.7 Article

Effective ensembles of heuristics for scheduling flexible job shop problem with new job insertion

期刊

COMPUTERS & INDUSTRIAL ENGINEERING
卷 90, 期 -, 页码 107-117

出版社

PERGAMON-ELSEVIER SCIENCE LTD
DOI: 10.1016/j.cie.2015.09.005

关键词

Flexible job shop scheduling; Ensemble; Heuristic; New job insertion; Multiple objectives

向作者/读者索取更多资源

This study investigates the flexible job shop scheduling problem (FJSP) with new job insertion. FJSP with new job insertion includes two phases: initializing schedules and rescheduling after each new job insertion. Initializing schedules is the standard FJSP problem while rescheduling is an FJSP with different job start time and different machine start time. The time to do rescheduling is the same as the time of new job insertion. Four ensembles of heuristics are proposed for scheduling FJSP with new job insertion. The objectives are to minimize maximum completion time (makespan), to minimize the average of earliness and tardiness (E/T), to minimize maximum machine workload (Mworkload) and total machine workload (Tworldoad). Extensive computational experiments are carried out on eight real instances from remanufacturing enterprise. The results and comparisons show the effectiveness of the proposed heuristics for solving FJSP with new job insertion. (C) 2015 Elsevier Ltd. All rights reserved.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

4.7
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据