ENERGY FOR SUSTAINABLE DEVELOPMENT
卷 31, 期 -, 页码 50-66出版社
ELSEVIER SCIENCE BV
DOI: 10.1016/j.esd.2015.12.001
关键词
OSeMOSYS; African electricity supply; Electricity trade; Cost-optimization; TEMBA
资金
- Vetenskapsradet (Swedish Research Council) [621-2014-4964]
- Swedish International Development Cooperation Agency (Sida) [51050071/11]
- ABB
Africa is a resource-rich continent but lacks the required power infrastructure. Efforts such as the United Nations Sustainable Energy for All and U.S. President Obama's Power Africa initiatives aim to facilitate much needed investment. However, no systematic national and regional investment outlook is available to analysts. This paper examines indicative scenarios of power plant investments based on potential for electricity trade. OSeMOSYS, a cost-optimization tool for long-term energy planning, is used to develop least cost system configurations. The electricity supply systems of forty-seven countries are modelled individually and linked via trade links to form TEMBA (The Electricity Model Base for Africa). A scenario comparison up to 2040 shows that an enhanced grid network can alter Africa's generation mix and reduce electricity generation cost. The insights have important investment, trade and policy implications, as specific projects can be identified as of major significance, and thus receive political support and funding. (C) 2015 International Energy Initiative. Published by Elsevier Inc. All rights reserved.
作者
我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。
推荐
暂无数据