期刊
JOURNAL OF MINING SCIENCE
卷 59, 期 3, 页码 490-496出版社
PLEIADES PUBLISHING INC
DOI: 10.1134/S106273912303016X
关键词
underground mine production planning; geological and mining information systems; production process flow modeling; resource constraints; mines
The authors present a multi-factor algorithm that considers geological and geotechnical constraints and resource availability for underground mine production planning. The algorithm allows for various combinations of heading or stoping conditions in each specific mine facility.
The authors present a multi-factor algorithm for making provisions for geological/geotechnical constraints and operation timing criteria subject to availability of resources. The algorithm enables embracing a variety of possible combinations of heading or stoping conditions at each specific underground mine facility. The algorithm is a part of the digital tool of automated underground mine production planning in geological and mining information system MINEFRAME.
作者
我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。
推荐
暂无数据