Green infrastructure; Sustainable stormwater management; Learning by doing; Pilot project; Adaptive management; New Cairo
In response to extreme rainfall events in Egypt's New Cairo, a pilot project was implemented using Green Infrastructure (GI) strategies for stormwater management. Lessons learned from the project and an expert survey on drivers, barriers, and enabling factors for implementing green infrastructure projects in Egypt were documented. Results showed the learning loops of the pilot project, drivers, barriers, and enabling factors. Recommendations based on the survey results and lessons learned were introduced.
In response to the extreme rainfall events that led to economic losses and undesirable impacts in New Cairo, Egypt, a pilot project is implemented using Green Infrastructure (GI) strategies for stormwater management to provide an adaptive solution. The paper aims to share lessons learned from the pilot project to improve stormwater management in a sustainable cost-effective manner. New Cairo GI project is documented through site visits and an interview with the project's technical manager. An experts' survey investigated the main drivers, barriers, and enabling factors for implementing green infrastructure projects in Egypt. Results show the learning loops of the New Cairo pilot project, drivers, barriers and enabling factors. Results from the experts' survey showed that GI environmental benefits and the cost of damages are the main drivers while involvement of planners with the right expertise is the main enabling factor. Recommendations based on the survey results and lessons learned are introduced.(c) 2023 THE AUTHORS. Published by Elsevier BV on behalf of Faculty of Engineering, Ain Shams University. This is an open access article under the CC BY-NC-ND license (http://creativecommons.org/licenses/ by-nc-nd/4.0/).
作者
我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。
推荐
暂无数据