4.8 Article

A two-stage scheduling method for integrated community energy system based on a hybrid mechanism and data-driven model

期刊

APPLIED ENERGY
卷 323, 期 -, 页码 -

出版社

ELSEVIER SCI LTD
DOI: 10.1016/j.apenergy.2022.119683

关键词

Dynamic energy hub (DEH); integrated community energy system (ICES); Off-design performance of equipment; Hybrid mechanism and data-driven model; Two-stage scheduling method

资金

  1. National Key Research and Development Program of China [2020YFD1100500]

向作者/读者索取更多资源

This paper proposes a two-stage scheduling method for the integrated community energy system (ICES) based on a hybrid mechanism and data-driven model. The method combines the mechanism energy hub model with a data-driven efficiency correction model to accurately extract nonlinear characteristics of equipment efficiency. Case studies demonstrate that the proposed method can improve the solution speed and accuracy of the scheduling model, and enhance the operating economy of the ICES.
The integrated community energy system (ICES) is an effective means to promote the synergies among multiple energy carriers. However, the off-design performance of equipment challenges the accurate and economical scheduling of the ICES. To solve this problem, a two-stage scheduling method for the ICES based on a hybrid mechanism and data-driven model is proposed in this paper. Combing the mechanism energy hub (EH) model with a data-driven efficiency correction model, a hybrid-driven dynamic energy hub (DEH) with variable equipment efficiency is built first. The EH describes the multi-energy coupling relationship; the embedded efficiency correction model adopts data-driven approaches of polynomial regression (PR) and backpropagation neural networks (BPNNs) to accurately extract nonlinear characteristics of equipment efficiency. On this basis, a two-stage scheduling model for the ICES is developed. In the day-ahead stage, the PR method is applied to calculate equipment efficiency which varies with load rate. The day-ahead scheduling model is established with the aim of minimizing the operating cost. In the intraday stage, considering the effects of load rate, temperature, and atmospheric pressure, the BPNNs method is employed to further correct equipment efficiency using the latest data. Furthermore, a rolling optimization (RO) strategy is used to address the uncertainties of equipment efficiency and load demand to improve the accuracy and economy of the scheduling scheme. Case studies demonstrate that the proposed method can improve the solution speed and accuracy of the scheduling model, and enhance the operating economy of the ICES.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

4.8
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据