4.3 Article

Performance Study of an 8-story Steel Building Equipped with Oil Damper Damaged During the 2011 Great East Japan Earthquake Part 2: Novel Retroit Strategy

出版社

TAYLOR & FRANCIS LTD
DOI: 10.3130/jaabe.15.303

关键词

isolator; oil damper; retroit; the 2011 Great East Japan Earthquake

资金

  1. National Science Foundation of China [51478356, 51208377]
  2. JSPS [26420559]
  3. Grants-in-Aid for Scientific Research [26420559] Funding Source: KAKEN

向作者/读者索取更多资源

In this paper, the full rehabilitation process of a damaged passively controlled building is reported. A hybrid retroit plan that uses tin-rubber bearings to replace the damaged oil dampers is proposed and tested within the size requirement and cost budget. Structural Identiication and nonlinear dynamic analyses have been conducted to verify the effectiveness of the hybrid retroit plan. After the rehabilitation was completed, the retrofitted building with tin-rubber isolators is proved by a recent earthquake to have a better seismic performance than the original building with oil dampers. Finally, the performance of the damping system will be discussed in this paper based on the performance-based design concepts. The performance level of the energy dissipation devices should be set accordingly based on the building performance level for the seismic rehabilitation design. The safety issues of the structural frame and retrofit procedure after the failure or degradation of the damping devices should be investigated in the future.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

4.3
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据