Critical project planning and spare parts inventory management in shutdown maintenance

期刊

出版社

ELSEVIER SCI LTD
DOI: 10.1016/j.ress.2021.108197

关键词

Shutdown maintenance; Project planning; Spare parts management; On-condition maintenance

向作者/读者索取更多资源

In this study, we propose a spare parts optimization model and algorithm to balance the cost of ordering spare parts and the cost of project delay. Using two-stage stochastic programming, we determine spare parts ordering policies and develop a detailed project schedule. Our sample average approximation method solves large instances quickly.
In the process industry, plant production is completely halted every so many years for large-scale maintenance comprising inspection, repair and overhaul. It is paramount that this shutdown maintenance is completed according to the planning, which requires timely availability of replacement parts. In this setting, we present a spare parts optimization model and algorithm that includes the cost-time trade-off and precedence constraints between maintenance activities. The objective is to balance between spare parts ordering cost and the expected project delay cost due to waiting for spare parts. Using two-stage stochastic programming, spare parts ordering policies are determined in the first stage and a detailed project schedule is developed in the second stage. We propose a sample average approximation with importance sampling and pruning of dominated activities to solve the problem, and demonstrate that this method solves large instances quickly. We also consider heuristics, e.g. the standard project management approach based on the widely used critical path method and two heuristics that draw from spare part inventory control literature. These heuristics give poor solutions.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

4.7
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据