4.7 Article

Optimization of design parameters of displacement isolation piles constructed between a high-speed railway bridge and a double-line metro tunnel: From the view point of vibration isolation effect

期刊

COMPUTERS AND GEOTECHNICS
卷 140, 期 -, 页码 -

出版社

ELSEVIER SCI LTD
DOI: 10.1016/j.compgeo.2021.104460

关键词

High-speed railway; Under crossing; Isolation piles; Wave scattering

资金

  1. National Natural Science Foundation of China [51708424]
  2. Fundamental Research Funds for the Central Universities of China

向作者/读者索取更多资源

This study focuses on the optimization design of isolation piles for a double-line metro tunnel construction beneath an existing high-speed railway bridge in a city of east China. The optimization target is to meet the displacement criteria of the bridge pile foundation during tunneling process and achieve an outstanding vibration mitigation effect. Steady-state finite element analysis is used to evaluate the limit of the pile spacing, and analytical and 3D models are established for further optimization of the pile parameters. The recommended optimized pile spacing is based on in-situ measurement data and evaluation results.
A double-line metro tunnel was constructed beneath an existing high-speed railway bridge in a city of east China. To avoid the unexpected displacement of the bridge resulting from the shield tunneling, the displacement isolation piles were employed between the shield tunnels and the pile foundation of the bridge. An accompanied optimization design issue of the isolation piles is analyzed in this work. The optimization target is not only that the displacement criteria of the bridge pile foundation during tunneling process must be met, but also an outstanding vibration mitigation effect in operation process should be achieved. In this work, a steady-state finite element analysis (FEA) is employed to evaluate the limit of the pile spacing according to the displacement criteria of the high-speed bridge. After that an analytical model and a three-dimensional (3D) finite-infinite element model of the bridge-foundation-tunnel system are established, respectively, for further optimization of the pile parameters from the view point of vibration isolation effect. The optimized pile spacing of the isolation piles for the real project case is finally recommended based on in-situ measurement data and the evaluation results.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。