4.7 Article

Text mining approach for bottleneck detection and analysis in printed circuit board manufacturing

期刊

COMPUTERS & INDUSTRIAL ENGINEERING
卷 154, 期 -, 页码 -

出版社

PERGAMON-ELSEVIER SCIENCE LTD
DOI: 10.1016/j.cie.2021.107121

关键词

Printed circuit board manufacturing; Job shop; Flow shop; Text mining; Bottleneck analysis; Production scheduling

资金

  1. Ministry of Science and Technology of Taiwan [MOST108-2410-H-009-047-MY2, MOST109-2923-H-009-001-MY3]

向作者/读者索取更多资源

This paper proposes a production scheduling procedure for a printed circuit board company using linear features and a three-phase scheduling approach for efficiency. The algorithm first analyzes data sets using the N-gram method to detect potential bottleneck machines, then solving them as flow shops. Finally, by incorporating different strategies to form approximate solutions, competitive solutions are achieved in a shorter time compared with the NEH algorithm for most instances.
This paper proposes a production scheduling procedure for the production lines of a printed circuit board company. Linearity features of the manufacturing process of this company are characterized and exploited for developing an efficient three-phase scheduling procedure. The production line is formulated as a linear job shop that resembles a flow shop. First, the N-gram modelling approach is adopted to analyse the data sets to detect the machines that would be candidates of the bottleneck in the production lines. Second, according to the candidates, the bottleneck data are extracted from the original data sets and solved as flow shops by a mixed integer programming model. The optimal solutions of the bottleneck flow shop is next extended by incorporating upstream and down stream operations to form approximate solutions of the original problems. We propose three different strategies for forming the approximate solutions and the best one is designated as the final solution. The performance of the proposed heuristic algorithm is tested and compared with the well-known NEH algorithm through numerical instances from real production lines. Statistics indicate that for most instances including up to 80 jobs the proposed method delivers competitive solutions within a much shorter time than the NEH algorithm.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

4.7
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据