When steel corrosion happens in concrete, the corrosion products migrate to the pores at the steel/concrete interface. The relationship between the thickness of the corrosion product-filled paste (CP) and that of the corrosion layer (CL) was analysed and established. This relationship can describe the phenomenon that the corrosion products are filling in the concrete pores and accumulating at the steel/concrete interface simultaneously. Based on this relationship, a corrosion-induced concrete surface cracking model which can quantitatively consider corrosion product-filled paste at the concrete/steel interface is proposed. This model is verified and in reasonable agreement with the experimental results. The possibility of the application of the proposed corrosion-induced cracking model to the non-uniform corrosion case is also discussed. (c) 2016 Elsevier Ltd. All rights reserved.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

4.7
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据