An enhanced multi-objective JAYA algorithm for U-shaped assembly line balancing considering preventive maintenance scenarios
出版年份 2020 全文链接
标题
An enhanced multi-objective JAYA algorithm for U-shaped assembly line balancing considering preventive maintenance scenarios
作者
关键词
-
出版物
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH
Volume -, Issue -, Pages 1-20
出版商
Informa UK Limited
发表日期
2020-09-07
DOI
10.1080/00207543.2020.1804639
参考文献
相关参考文献
注意:仅列出部分参考文献,下载原文获取全部文献信息。- Variable takt times in mixed-model assembly line balancing with random customisation
- (2020) Tobias Mönch et al. INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH
- Ergonomic risk and cycle time minimization for the U-shaped worker assignment assembly line balancing problem: A multi-objective approach
- (2020) Zikai Zhang et al. COMPUTERS & OPERATIONS RESEARCH
- Multi-objective evolutionary simulated annealing optimisation for mixed-model multi-robotic disassembly line balancing with interval processing time
- (2019) Yilin Fang et al. INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH
- Mathematical model and grey wolf optimization for low-carbon and low-noise U-shaped robotic assembly line balancing problem
- (2019) Zikai Zhang et al. JOURNAL OF CLEANER PRODUCTION
- Improved imperialist competitive algorithms for rebalancing multi-objective two-sided assembly lines with space and resource constraints
- (2019) Yahui Zhang et al. INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH
- Iterated local search method and mathematical model for sequence-dependent U-shaped disassembly line balancing problem
- (2019) Zixiang Li et al. COMPUTERS & INDUSTRIAL ENGINEERING
- The impact of incomplete vessel arrival information on container stacking
- (2019) Yuyan He et al. INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH
- Enhanced migrating birds optimization algorithm for U-shaped assembly line balancing problems with workers assignment
- (2018) Zikai Zhang et al. NEURAL COMPUTING & APPLICATIONS
- Modelling and optimisation of energy-efficient U-shaped robotic assembly line balancing problems
- (2018) Zikai Zhang et al. INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH
- Design optimization and analysis of selected thermal devices using self-adaptive Jaya algorithm
- (2017) R.V. Rao et al. ENERGY CONVERSION AND MANAGEMENT
- A Pareto improved artificial fish swarm algorithm for solving a multi-objective fuzzy disassembly line balancing problem
- (2017) Zeqiang Zhang et al. EXPERT SYSTEMS WITH APPLICATIONS
- A modified multi-objective genetic algorithm for two-sided assembly line re-balancing problem of a shovel loader
- (2017) Yahui Zhang et al. INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH
- Rebalancing the assembly lines: exact solution approaches
- (2017) Ece Sancı et al. INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH
- Multi-objective artificial bee colony algorithm for order oriented simultaneous sequencing and balancing of multi-mixed model assembly line
- (2017) Ullah Saif et al. JOURNAL OF INTELLIGENT MANUFACTURING
- An interactive fuzzy programming approach for bi-objective straight and U-shaped assembly line balancing problem
- (2016) M.H. Alavidoost et al. APPLIED SOFT COMPUTING
- Minimizing tardiness and maintenance costs in flow shop scheduling by a lower-bound-based GA
- (2016) Andrew Junfang Yu et al. COMPUTERS & INDUSTRIAL ENGINEERING
- A population-based algorithm for the bi-objective assembly line worker assignment and balancing problem
- (2016) P. Th. Zacharia et al. ENGINEERING APPLICATIONS OF ARTIFICIAL INTELLIGENCE
- A new heuristic-based bi-objective simulated annealing method for U-shaped assembly line balancing
- (2016) Masood Fathi et al. European Journal of Industrial Engineering
- Balancing stochastic U-lines using particle swarm optimization
- (2016) Emel Kızılkaya Aydoğan et al. JOURNAL OF INTELLIGENT MANUFACTURING
- Fuzzy adaptive genetic algorithm for multi-objective assembly line balancing problems
- (2015) M.H. Alavidoost et al. APPLIED SOFT COMPUTING
- A decomposition based solution algorithm for U-type assembly line balancing with interval data
- (2015) Öncü Hazır et al. COMPUTERS & OPERATIONS RESEARCH
- Ergonomics in assembly line balancing based on energy expenditure: a multi-objective model
- (2015) Daria Battini et al. INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH
- A branch and bound method for the line balancing problem in U-shaped assembly lines with equipment requirements
- (2015) Dilek Ogan et al. JOURNAL OF MANUFACTURING SYSTEMS
- Simulated imperialist competitive algorithm in two-stage assembly flow shop with machine breakdowns and preventive maintenance
- (2015) Hany Seidgar et al. PROCEEDINGS OF THE INSTITUTION OF MECHANICAL ENGINEERS PART B-JOURNAL OF ENGINEERING MANUFACTURE
- Integrating sequence-dependent group scheduling problem and preventive maintenance in flexible flow shops
- (2014) Alireza Khamseh et al. INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY
- Two-machine flow shop scheduling integrated with preventive maintenance planning
- (2014) Shijin Wang et al. INTERNATIONAL JOURNAL OF SYSTEMS SCIENCE
- Coordinative production and maintenance scheduling problem with flexible maintenance time intervals
- (2014) Mostafa Khatami et al. JOURNAL OF INTELLIGENT MANUFACTURING
- Balancing U-shaped assembly lines with resource dependent task times: A Simulated Annealing approach
- (2014) Sachin Jayaswal et al. JOURNAL OF MANUFACTURING SYSTEMS
- Hidden maintenance opportunities in discrete and complex production lines
- (2013) Xi Gu et al. EXPERT SYSTEMS WITH APPLICATIONS
- Multi-objective preventive maintenance and replacement scheduling in a manufacturing system using goal programming
- (2013) Kamran S. Moghaddam INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS
- Hybrid firefly-simulated annealing algorithm for the flow shop problem with learning effects and flexible maintenance activities
- (2013) Behdin Vahedi Nouri et al. INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH
- Two-stage hybrid flow shop scheduling with preventive maintenance using multi-objective tabu search method
- (2013) Shijin Wang et al. INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH
- Multi-objective artificial bee colony for interval job shop scheduling with flexible maintenance
- (2012) Deming Lei INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY
- Chemical-reaction optimization for solving fuzzy job-shop scheduling problem with flexible maintenance activities
- (2012) Jun-qing Li et al. INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS
- An imperialist competitive algorithm for multi-objective U-type assembly line design
- (2012) A. Nourmohammadi et al. Journal of Computational Science
- An effective heuristic for flexible job-shop scheduling problem with maintenance activities
- (2010) Shijin Wang et al. COMPUTERS & INDUSTRIAL ENGINEERING
- Bi-objective optimization research on integrated fixed time interval preventive maintenance and production for scheduling flexible job-shop problem
- (2010) E. Moradi et al. EXPERT SYSTEMS WITH APPLICATIONS
- A GRASP algorithm for flexible job-shop scheduling with maintenance constraints
- (2010) M. Rajkumar et al. INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH
- Simultaneous scheduling of production and maintenance tasks in the job shop
- (2010) M. Ben Ali et al. INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH
- Scheduling sequence-dependent setup time job shops with preventive maintenance
- (2008) B. Naderi et al. INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY
Find Funding. Review Successful Grants.
Explore over 25,000 new funding opportunities and over 6,000,000 successful grants.
ExploreAdd your recorded webinar
Do you already have a recorded webinar? Grow your audience and get more views by easily listing your recording on Peeref.
Upload Now