4.7 Article

A Risk-Averse Conic Model for Networked Microgrids Planning With Reconfiguration and Reorganizations

期刊

IEEE TRANSACTIONS ON SMART GRID
卷 11, 期 1, 页码 696-709

出版社

IEEE-INST ELECTRICAL ELECTRONICS ENGINEERS INC
DOI: 10.1109/TSG.2019.2927833

关键词

Microgrids; Planning; Stochastic processes; Reliability; Numerical models; Load modeling; Computational modeling; Microgrids expansion planning; generalized network reconfiguration; stochastic mixed-integer conic program; condition value-at-risk; Benders decomposition

资金

  1. Key Research and Development Program of Shaanxi through Research and Demonstration on Key Technologies of Energy Internet Planning and Operation Based on Multi-Time Scale and Multi-Energy Complementary Optimization [2019ZDLGY18-01]
  2. National Science Foundation [CMMI 1635472]
  3. DoE [OE0000842]

向作者/读者索取更多资源

The advanced switching techniques enable the topology reconfiguration of microgrids (MGs) in active distribution network. In this paper, we enhance and generalize the traditional reconfiguration strategy resorting to the concept of dynamic MGs (i.e., the reorganization of MGs boundaries), to achieve a higher operational feasibility against the emergency islandings. Also, a risk-averse two-stage mixed integer conic program model is presented to support the networked MGs planning with generalized reconfiguration decisions. The MGs capacity expansion and seasonal reconfiguration decisions are made in the first stage, and validated under stochastic islanding scenarios in the second stage, where the network operations are captured by a second-order conic program (SOCP). Furthermore, a conditional value-at-risk (CVaR) measure is involved to quantitatively control the islanding risks. By theoretically proving the strong duality of the SOCP subproblem, we develop and customize Benders decomposition method with the guaranteed finite convergence to the optimal value. Finally, numerical results on 33- and 56-bus networked MGs validate the effectiveness of proposed reconfiguration strategy as well as planning approach. Our method demonstrates a cost-saving up to 22.56 when comparing to the traditional scheme with fixed MGs boundaries.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

4.7
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据