4.4 Article

Mooring positioning performance of jack-up platform

期刊

SHIPS AND OFFSHORE STRUCTURES
卷 15, 期 6, 页码 633-644

出版社

TAYLOR & FRANCIS LTD
DOI: 10.1080/17445302.2019.1663657

关键词

Jack-up platform; mooring positioning; mooring line; coupling analysis; optimisation method

资金

  1. Six Talent Peaks Project in Jiangsu Province, China [2011A031]
  2. Ministry of Industry and Information Technology, China [2013411-031]

向作者/读者索取更多资源

This study focussed on the mooring positioning of a jack-up platform. A numerical analysis was performed using ANSYS to examine the performance of a mooring system in time and frequency domains. The hydrodynamic response of the platform was analysed, and response amplitude operators were obtained in the frequency domain. A coupling analysis of platform motion was performed in the time domain, which examined the effects of environmental loading directions on platform displacements and the influence of mooring line parameters on mooring positioning performance. The primary concern was effects of the incident angle of environmental load on six components of platform displacement and mooring line tension. Moreover, a multi-objective optimisation technique was employed to control the length and tension of the mooring line in towing and positioning, which can determine the optimal length of the mooring line and then assist in achieving accurate platform positioning and steady mooring.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

4.4
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据