4.1 Article

Use of Shuttered Hospitals to Expand Surge Capacity

期刊

PREHOSPITAL AND DISASTER MEDICINE
卷 23, 期 2, 页码 121-127

出版社

CAMBRIDGE UNIV PRESS
DOI: 10.1017/S1049023X00005720

关键词

closed hospitals; hospitals; surge capacity

资金

  1. Agency for Healthcare Research and Quality IDSRN Task Order [8]

向作者/读者索取更多资源

Introduction: With limited available hospital beds in most urban areas, there are very few options when trying to relocate patients already within the hospital to make room for incoming patients from a mass-casualty incident (MCI) or epidemic (a patient surge). This study investigates the possibility and process for utilizing shuttered (closed or former) hospitals to accept medically stable, ambulatory patients transferred from a tertiary medical facility. Methods: Two recently closed, acute care hospitals were evaluated critically to determine if they could be made ready to accept inpatients within 3-7 days of a MCI. This surge facility ideally would be able to support 200-300 patients/beds. Two generic scenarios were used for planning: (1) a patient surge (including one caused by conventional war or terrorism, weapons of mass destruction, or a disaster caused by natural hazards) requiring transfer of ambulatory, medically-stable inpatients to another facility in an effort to increase capacity at existing hospitals; and (2) a bio-event or epidemic where a shuttered hospital could be used as an isolation facility. Results: Both recently closed hospitals had significant, but different challenges to reopening, although with careful planning and resource allocation it would be possible to reopen them within 3-7 days. Planning was the most conclusive recommendation. It does not appear possible to reopen shuttered hospitals with major structural deterioration or a complete lack of current mission (i.e., no current utilities). Staffing would represent die most challenging issue as a surge facility would represent an incremental additional need for existing and scarce human resources. Conclusions: With careful planning, a shuttered hospital could be reopened and ready to accept patients within 3-7 days of a MCI or epidemic.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

4.1
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据