期刊
WATER RESOURCES MANAGEMENT
卷 28, 期 3, 页码 671-682出版社
SPRINGER
DOI: 10.1007/s11269-013-0507-9
关键词
Rainwater Harvesting; Optimum Cistern Capacity; Flood Risk; Runoff Volume Reduction; Industrial Park
资金
- Priority Academic Program Development of Jiangsu Higher Education Institutions(PAPD)
It is urgent to effectively mitigate flood disasters in humid mountainous areas in southeastern China for the increasing flood risk under urbanization and industrialization. In this study, a rural district with an area of 13.39 km(2) that planning to build an industrial park covering an area of 7.98 km(2) in Changting was selected to estimate the potential of collectable rainwater and the extent to which runoff volume can potentially be mitigated by rainwater harvesting. In addition, the optimum cistern capacity of a rainwater harvesting system in the planned industrial park was evaluated using daily water balance simulation and cost-efficiency analysis. The results showed that rainwater harvesting in the planned industrial park has great potential. The annually collectable rainwater is approximately 9.8 x 10(6) m(3) and the optimum cistern capacity is determined to be 0.9 x 10(6) m(3). With the optimum cistern capacity, the annual rainwater usage rate is 0.99, showing neither financial savings nor deficits. Rainwater harvesting can reduce 100 % of runoff volume in the cases of critical rainfall storm (50 mm) and annual average maximum daily rainfall (111.2 mm), and 58 % of runoff volume in the case of maximum daily rainfall (233.6 mm), respectively. All surface runoff can be collected and stored in the cisterns when rainfall amount is less than 135.5 mm in a rainstorm event.
作者
我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。
推荐
暂无数据