期刊
ROBOTICS AND COMPUTER-INTEGRATED MANUFACTURING
卷 29, 期 3, 页码 64-72出版社
PERGAMON-ELSEVIER SCIENCE LTD
DOI: 10.1016/j.rcim.2012.04.014
关键词
Mixed-line production; Bottleneck; Re-scheduling; DBR
This paper is to establish and solve the re-scheduling problems under a flow-shop mixed-line production planning. A case study of the final stage, module manufacturing, of TFT-LCD is provided for illustration of the developed mechanism. In this research, the mixed-line production system and its rescheduling problems are discussed. The buffer management and the DBR scheduling methods based on the Theory of Constraints are used to detect, identify, and level the bottleneck problems in the system. The direct contribution of the results is to increase the production flexibility and mobility of the manufacturing scheduling system and to benefit the entire members of supply chain system. The simulation software, Flexsim, is used to construct and evaluate the developed model, some phenomena of simulated system performance on the maximum delay of orders, the total cost of delay, and make span are discussed. (C) 2012 Elsevier Ltd. All rights reserved.
作者
我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。
推荐
暂无数据