期刊
PROCEEDINGS OF THE IEEE
卷 99, 期 1, 页码 214-232出版社
IEEE-INST ELECTRICAL ELECTRONICS ENGINEERS INC
DOI: 10.1109/JPROC.2010.2070051
关键词
Capacity credit; frequency regulation; grid integration of variable resources; look-ahead scheduling; renewable energy; unit commitment (UC); wind power generation
资金
- U.S. National Science Foundation [CNS0428404]
- Texas Engineering Experiment Station
- Pennsylvania Infrastructure Technology Alliance (PITA)
- Directorate For Engineering [1029873] Funding Source: National Science Foundation
This paper surveys major technical challenges for power system operations in support of large-scale wind energy integration. The fundamental difficulties of integrating wind power arise from its high inter-temporal variation and limited predictability. The impact of wind power integration is manifested in, but not limited to, scheduling, frequency regulations, and system stabilization requirements. Possible alternatives are suggested for a more reliable and cost-effective power system operation. New computationally efficient methods for improving system performances by using prediction and operational interdependencies over different time horizons remain critical open research problems.
作者
我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。
推荐
暂无数据