期刊
JOURNAL OF VIBRATION AND CONTROL
卷 19, 期 12, 页码 1906-1914出版社
SAGE PUBLICATIONS LTD
DOI: 10.1177/1077546312444769
关键词
Blasting; ground vibration; PPV; vibration control ANFIS
In this research a study was conducted to predict the ground vibrations produced by blasting projects in the structures of Karoun 3 power plant and dam (Izeh town, Iran) using a conventional statistical approach and a relatively new soft computing method known as the adaptive neuro-fuzzy inference system (ANFIS). For this aim a series of field measurements were planned and the required data were observed. A neuro-fuzzy model was constructed based on the data. In this model, the distance from the blasting site to the monitoring stations and the maximum charge weight per delay were selected as the input parameters of the constructed model, the output parameter being the peak particle velocity (PPV) as the vibration indicator. The results showed that the ANFIS model associated with the empirical model is a reliable and proper technique to predict the PPV caused from blasting.
作者
我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。
推荐
暂无数据