4.4 Article

Analysis on dam-breaking mode of Tangjiashan barrier dam in Beichuan county

期刊

JOURNAL OF MOUNTAIN SCIENCE
卷 8, 期 2, 页码 354-362

出版社

SCIENCE PRESS
DOI: 10.1007/s11629-011-2097-4

关键词

Tangjiashan; Barrier Dam; High-speed landslide; Blocking river; Dam-breaking

资金

  1. National Natural Science Foundation [40772175, 40972175]
  2. Southwest Jiaotong University [2008-A01]
  3. State Key Laboratory of Geohazard Prevention and Geoenvironment Protection (Chengdu University of Technology) [DZKJ-08012]
  4. National Natural Science Foundation of Yunnan Province [U1033601]

向作者/读者索取更多资源

Tangjiashan landslide is a typical highspeed consequent landslide of medium-steep dip angle. This landslide triggered by earthquake took place in about semi-minute. The relative sliding displacement is 900 meters, so average sliding speed is about 30 meters per second. The longitudinal length of barrier dam which is formed by high-speed landslide along river is 803.4 meters; and maximum width crossing river is 611.8 meters. And its volume is estimated about 20.37 million steres. Through detailed geological investigation of the barrier dam, together with early geological information before earthquake, geological structures of the barrier dam and its stability of upstream and downstream slopes are studied when water level reaches different elevations in condition of continual after shocks with seismic intensity of 7 or 8 Richter scale. On this basis, dam-breaking mode of barrier dam is discussed deeply. Thereby, analytic results provide significant guidance and advices to front headquarters of Tangjiashan barrier dam, so that some proper engineering measures can be implemented and flood discharge can be carried out well.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

4.4
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据