4.5 Article

Rapid construction and settlement behavior of embankment systems on soft foundation soils

出版社

ASCE-AMER SOC CIVIL ENGINEERS
DOI: 10.1061/(ASCE)1090-0241(2008)134:3(289)

关键词

-

向作者/读者索取更多资源

The 1-15 Reconstruction Project in Salt Lake City, Utah required rapid embankment construction in an urban environment atop soft lacustrine soils. These soils are compressible, have low shear strength, and require significant time to complete primary consolidation settlement. Because of this, innovative embankment systems and foundation treatments were employed to complete construction within the approved budget and demanding schedule constraints. This paper evaluates and compares the construction time, cost, and performance of three embankment/foundation systems used on this project: (1) one-stage mechanically stabilized earth (MSE) wall supported by lime cement columns; (2) expanded polystyrene (geofoam) embankment with tilt-up panel fascia walls; and (3) two-stage MSE wall with prefabricated vertical drain installation and surcharging. Of the technologies evaluated, the geofoam embankment had the best performance based on settlement and rapid construction time considerations, but is more costly to construct than a two-stage MSE wall with PV drain foundation treatment. The one-stage MSE wall with lime cement treated soil was the most costly, and did not perform as well as expected; thus, it had only limited use on the project.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

4.5
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据