期刊
出版社
ELSEVIER SCIENCE BV
DOI: 10.1016/j.nimb.2015.05.028
关键词
Accelerator mass spectrometry; Fast-cycling system; Actinides
类别
资金
- Australian Government through the Heavy Ion Accelerators Education Investment Fund (EIF) Project
In order to perform higher precision measurements, an upgrade of the ANU accelerator is underway. Fast switching times on the low-energy side, with maximum settling times of 30 ms, are achieved by holding the injector magnet field constant while changing the energy of the different isotopes by changing the pre-acceleration voltage after the ion source. Because ions of the different isotopes then have different energies before injection, it is necessary to adjust the strength and steering of the electrostatic quadrupole lens that focusses the beam before entry into the accelerator. First tests of the low-energy system will be reported. At the high energy end, a larger vacuum box in the analyzing magnet has been designed, manufactured and installed to allow the transport of differences in mass as large as 10% at constant terminal voltage. For the cases where more than one isotope must be transported to the detector an additional refinement is necessary. If the accelerator voltage is to be kept constant, then the trajectories of the different isotopes around both the analyzing and switching magnets must be modified. This will be achieved using bounced electrostatic steerers before and after the magnets. Simulations have been performed with the ion optic code COSY Infinity to determine the optimal positions and sizes of these steerers. (C) 2015 Published by Elsevier B.V.
作者
我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。
推荐
暂无数据