Three-Stage Least-Squares Analysis of Time and Cost Overruns in Construction Contracts

期刊

出版社

ASCE-AMER SOC CIVIL ENGINEERS
DOI: 10.1061/(ASCE)CO.1943-7862.0000225

关键词

Construction planning; Construction costs; Project management; Forecasting; Statistical models

向作者/读者索取更多资源

Construction cost overrun and time overrun (delay) are a significant problem in highway-construction project delivery. Previous research studies have provided insight into the factors that affect overruns; however the findings may have been limited because they do not explicitly consider the simultaneous relationship between cost and time overruns. In this paper, we use data from Indiana highway projects to provide empirical evidence that a simultaneous relationship exists between cost and time overruns and that analysis of these two contractual outputs need to take due cognizance of such simultaneity. Using the three-stage least-squares technique, we identify a number of factors that significantly affect cost overrun and time overrun and we show how the effect of these variables vary by attributes such as project type and results of the bidding process. The models developed in this paper can help agencies enhance the estimation of the expected overruns of final cost and the delay in completion time for their planned projects.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

4.5
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据