4.7 Review

An assessment of delayed hydride cracking in zirconium alloy cladding tubes under stress transients

期刊

INTERNATIONAL MATERIALS REVIEWS
卷 58, 期 6, 页码 349-373

出版社

TAYLOR & FRANCIS LTD
DOI: 10.1179/1743280412Y.0000000013

关键词

Delayed hydride cracking; Zirconium alloys; Nuclear fuel rod cladding; Hydride reorientation; Hydride embrittlement; High burnup nuclear fuel rods

资金

  1. US Nuclear Regulatory Commission (NRC) [NRC-02-07-006]

向作者/读者索取更多资源

Zirconium alloy cladding tubes used in nuclear fuel rods are susceptible to delayed hydride cracking, which is a time dependent crack growth process resulting from the stress assisted diffusion of hydrogen to the crack tip, followed by the formation of radial hydrides and the subsequent fracture of the hydrides in the crack tip region. This article reviews the current understanding of the delayed hydride cracking behaviour of zirconium alloy cladding tubes for fuel rods, focusing on the degradation mechanisms in high burnup fuel rods and transient loading scenarios, which could potentially lead to substantial changes in the hydride microstructure and cladding failure by delayed hydride cracking following removal from the reactor and during storage and disposal of spent nuclear fuel rods in a waste repository. A brief summary of the general characteristics of delayed hydride cracking in zirconium alloy cladding is presented first. Relevant information on the cladding stresses under various usage conditions is then compiled and categorised into several characteristic stress transients that can be anticipated during reactor operation. Delayed hydride cracking in cladding tubes under stress transients is then examined under various temperatures, cooling rates, burnup levels and loading conditions.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

4.7
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据