4.7 Article

Flexible job shop with continuous material flow

期刊

INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH
卷 53, 期 4, 页码 1273-1290

出版社

TAYLOR & FRANCIS LTD
DOI: 10.1080/00207543.2014.955925

关键词

tabu search; material flow; block approach; production modelling; flexible job shop; critical path

向作者/读者索取更多资源

A new scheduling problem, the continuous flow flexible job shop (CF-FJS) is proposed. The formulation combines the well-known flexible job shop (FJS) problem and a dedicated continuous material flow model (MFM). In the MFM, operations are represented by material flow functions derived by integration of arbitrarily defined speed patterns. Two main concepts of the MFM formalism, i.e. variable speed of processing and continuous material flow, lead to position-dependent processing times and overlapping in operations which extend standard FJS formulation. Properties of the CF-FJS are investigated. A tabu search sched uling algorithm utilising these properties is proposed. Effective neighbourhood functions are defined based on elimination approaches. Two auxiliary procedures: search intensification level switching and fast feasibility detection are added to improve algorithm efficiency. The algorithm is verified using dedicated benchmark instances which comprise non-trivial representations of the CF-FJS specific features, i.e. machine efficiency patterns and minimum inter-operation buffers. The research is motivated by task scheduling in a fastener factory, but the presented results can be useful in many domains, such as production of granular goods, steel details, glass and fluids. The solution can be used in real-world applications. The published results can be helpful in testing new CF-FJS scheduling algorithms.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

4.7
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据